Back to Industrial

Neproplast Pre-Engineered Steel Factory

Factory design development for New Products Industries — pre-engineered steel structure at MODON 1 Jeddah industrial area.

Project Overview

MOK Architects developed the factory design for New Products Industries (Neproplast), a pre-engineered steel structure located in MODON’s first Jeddah industrial city. The project ran from 1985 to 1989, delivering an industrial facility suited to the company’s manufacturing operations.

Scope of Work

Our team handled factory design development, structural engineering, mep coordination, along with authority approvals.

Working on something similar?

Bring us in early.

The earlier we coordinate engineering with architectural intent, the better the project performs — on cost, on schedule, and on compliance.